Evaluation

I think the construction for my house model went well. We worked on it and got it done quite fast. We were able to build the walls, roof, floor and details in one period. Some difficulties I came across whilst creating my model were, the circuit and installing it. The circuit took a while as I had to do a lot of research on it and it took me a while to actually complete it. I found it difficult to install the circuits as it was hard to cut holes into the roof to put the LED light in. It was also hard because when we did get the LED into the hole, the wires would touch, therefore breaking the circuit. Some changes we made to our model was instead of making our house have 5 rooms we changed it to 4 so that we would be able to make the walls look nicer and also becuase f our time constraints. We also chenged our plan for having one series circuit to light up the whole house. Instead we made four parallel circuits. We did this because we didn’t have space to stick one big circuit on our house.

Leave a comment